The EPA's Final Coal Combustion Residual (CCR) Rule was published on April 17, 2015 and went into effect on October 19, 2015. The rule regulates existing active CCR waste landfills and surface impoundments (ponds) and all new CCR waste disposal units built after the rule's publication. The rule also regulates inactive surface impoundments that contain CCRs and water after the rule's effective date. Tampa Electric's Big Bend Station has existing onsite CCR surface impoundments regulated under the rule. The company is required to perform groundwater monitoring, formulate operating plans for its regulated CCR units and to post the resulting reports and other documents on this website.
TECO Big Bend CCR Rule Compliance Data and Information
- Economizer Ash System - Closure Completion - (Posted 11/11/21)
- TECO Big Bend CCR Annual Report 2020 - (Posted 01/27/21)
- TECO Big Bend Coalfield Pond Closure Certification 2021 - (Posted 01/08/21)
- TECO Big Bend Eapp Annual Report 2019 - (Posted 01/23/20)
- Economizer Ash CCR Closure Temp Ditch Crossing Hydrology Report - (Posted 07/26/19)
- Economizer Ash CCR Closure Temp Ditch Crossing Plans - (Posted 07/26/19)
- Ash Ponds Detection Monitoring Report (Baseline) - (Posted 07/15/19)
- Ash Ponds Detection Monitoring Report 4 - (Posted 07/15/19)
- Ash Ponds Detection Monitoring Report 3 - (Posted 07/15/19)
- Ash Ponds Closure Specifications - (Posted 04/02/19)
- Ash Ponds Closure Plan Drawings - (Posted 04/02/19)
- Ash Ponds System CCR Impoundment Inspection Report - 2018 - (Posted 02/28/19)
- Ash Ponds System CCR Impoundment Inspection Report - 2017 - (Posted 02/28/19)
- Ash Ponds Annual GW Report - 2018 - (Posted 01/22/19)
- Ash Ponds Detection Monitoring Report 2 - (Posted 01/10/19)
- Slag Pond Closure Plan - (Posted 10/03/18)
- Ash Ponds Ash Closure Plan - (Posted 10/03/18)
- Ash Ponds Alternate Source Demonstration (ASD) - (Posted 04/17/18)
- Ash Ponds Certification of Alternate Source Demonstration - (Posted 04/17/18)
- Ash Ponds Annual GW Report - (Posted 02/06/18)
- GW Monitoring System Design and Construction Report - 2017 - (Posted 10/24/17)
- CCR Statistical Analysis Plan - 2017 - (Posted 10/24/17)
- Structural Stability Report CCR Economizer Ash System - 2017 - (Posted 5/26/17)
- Annual Berm Inspection Report - 2016 - (Posted 5/26/17)
- Ash and Slag Ponds Preliminary Closure Plan - (Posted 10/20/16)
- CCR Groundwater Monitoring Plan & Statistical Method Certification - (Posted 10/07/16)
- Ash Ponds System CCR Impoundment Inspection Report - 2015 - (Posted 02/05/16)
- CCR Fugitive Dust Control Plan - (Posted 11/3/15)